Tata Power Renewables Energy Ltd (TPREL), a wholly-owned subsidiary of Tata Power on Monday announced that the group has commissioned a 300 MW project in Dholera, Gujarat. The plant has India’s largest single-axis solar tracker system. The project is set to generate 774 MUs annually. Important to note here is that the Renewable Energy plant will reduce approximately 704340 MT/year of carbon emission.
Dr. Praveer Sinha, CEO & Managing Director, Tata Power, said “Commissioning of India’s largest single-axis solar tracker system of 300 MW Solar plant at Dholera in Gujarat within the set timelines is a proud moment for Tata Power.” He further added that, technical expertise and project execution skills will further solidify position of Tata Power in the solar EPC space and help India lead the way in renewable energy growth.
With a new capacity addition Tata Power will have an operation capacity of 3400 MW with 2,468 MW of Solar and 932 MW of Wind. Tata Power’s total Renewable capacity is 5,020 MW including 1,620 MW of Renewable projects under various stages of implementation.